The City of Thunder Bay would like to hear from you!


As we continue to plan, develop, and build our Waterfront’s future we need to know:

•    What you liked from the 2015 Waterfront Master Plan Update.

•    What has been successful at the marina so far, and what you have used.

•    What you would like to see developed oin these lands.

•    Inform everyone of the existing components on site and new opportunities we are currently building on.

•    Generate awareness and bring new ideas to the plan.


Background/Area in Discussion

Please see the Get Involved project page for the project boundary and in-depth background information: 

Key elements connected or within these lands that are either existing, built, or under construction that are to remain or have plans to be expanded upon include:


•    Thunder Bay Art Gallery (under construction)

•    Newly renovated & expanded Cruise Ship Docking Facility

•    Pool 6 Waterfront Trail segment and lookouts (Stage 1 complete)

•    Pool 6 shoreline stormwater management wetland & habitat areas (under construction)

•    Habitat Pond plus 1.5Ha of Provincially Significant Wetlands

•    Sleeping Giant Parkway extension south passed the Art Gallery site to Pool 6