The City of Thunder Bay is carrying out a study to determine the preferred stormwater management improvement at two (2) different locations. These projects will possibly be constructed outside the municipal road allowance and/or will include the construction of new storm sewer outfalls into the Neebing River. The stormwater management projects being considered include the construction of the new storm sewer outfalls and possibly the construction of new Green Infrastructure facilities, also known as Low Impact Development facilities, which are landscaped, shallow depressions, intended to clean stormwater and reduce flooding. The two (2) projects are:

1. Legion Track Drive – North limit of Legion Track Drive, South of Neebing River, including new storm outfall.

2. Franklin Street North – South of Cameron Street, North of Neebing River, including new storm outfall

Please view Notice of Study - Additional Info - Stormwater Management & Storm Sewer Outfall Locations for additional details and imagery of the locations under consideration.

These projects are being planned under Schedule “B” of the Municipal Class Environmental Assessment.

Public input and comments were invited until December 14, 2021


If you require accessible versions of documents, please email: amanda.nason@thunderbay.ca

For further information on any of these projects or on the planning process being followed, please contact Mr. Aaron Ward, P. Eng., Project Engineer, City of Thunder Bay, VictoriaVille Civic Centre, 111 Syndicate Avenue South, 2nd Floor, P.O. Box 800, Thunder Bay, ON P7C 5K4.

Telephone: (807) 625-2444
Email: aaron.ward@thunderbay.ca

The City of Thunder Bay is carrying out a study to determine the preferred stormwater management improvement at two (2) different locations. These projects will possibly be constructed outside the municipal road allowance and/or will include the construction of new storm sewer outfalls into the Neebing River. The stormwater management projects being considered include the construction of the new storm sewer outfalls and possibly the construction of new Green Infrastructure facilities, also known as Low Impact Development facilities, which are landscaped, shallow depressions, intended to clean stormwater and reduce flooding. The two (2) projects are:

1. Legion Track Drive – North limit of Legion Track Drive, South of Neebing River, including new storm outfall.

2. Franklin Street North – South of Cameron Street, North of Neebing River, including new storm outfall

Please view Notice of Study - Additional Info - Stormwater Management & Storm Sewer Outfall Locations for additional details and imagery of the locations under consideration.

These projects are being planned under Schedule “B” of the Municipal Class Environmental Assessment.

Public input and comments were invited until December 14, 2021


If you require accessible versions of documents, please email: amanda.nason@thunderbay.ca

For further information on any of these projects or on the planning process being followed, please contact Mr. Aaron Ward, P. Eng., Project Engineer, City of Thunder Bay, VictoriaVille Civic Centre, 111 Syndicate Avenue South, 2nd Floor, P.O. Box 800, Thunder Bay, ON P7C 5K4.